PLUTON took part in the InnoTrans 2024 in Berlin More details
Ukraine |en

Sites

"Cicero" traction substation

Works performed

"Turn-key" project. Design, equipment manufacturing and supply, supervision, commissioning.

Supply of Cicero two-unit modular traction substation, including:

  • module — 2 units;
  • DC switchgear 750 V— 6 units; 
  • switchgear SM6 20 kV — 4 units;
  • low-voltage switchgear — 3 units;
  • withdrawable rectifier — 2 units;
  • traction transformer Resiglas 1000 kVA — 2 units;
  • auxiliaries transformer Resiglas 63 kVA — 1 unit;
  • telecontrol cabinet — 1 unit;
  • operating current cabinet — 1 unit;
  • auxiliaries cabinet — 2 units;
  • contact network overvoltage protection unit OVLD — 1 unit;
  • protection unit DEPEC — 1 unit.