PLUTON presents a new SOTA protection and monitoring system More details
Ukraine |en

PLUTON is glad to introduce our new and successfully implemented "turn-key" project — "Telefoniczna" traction substation in Łódź (Poland).

This project is remarkable by a high level of complexity and is of great importance for our Customer — "MPK Łódź" tram department. The new powerful traction substation "Telefoniczna" is equipped with 4 rectifiers (1600 kVA each) and provides power supply of 17 outgoing lines in main and the largest tram depot in Łódź.

Implementation of this project included the following scope of works: design, the building of new substation, equipment supply, including telecontrol and operator control equipment set, cables laying, the scope of electric installation and commissioning works as well as demolition of the former substation.

PLUTON expresses our gratitude to "MPK Łódź" for confidence and support, and looks for further fruitful cooperation!