Modular traction substation Przygraniczna

Works performed

Design, equipment supply, installation supervision, commissioning

Pluton successfully implemented the project for the supply and installation of Przygraniczna modular traction substation for power supply of tram line No. 43 connecting Lodz and Konstantinuv-Lodzki in Poland in 2024.

Main features of the project:

  • The substation includes: two modules - AC and DC.
  • Equipment supplied by Pluton: withdrawable traction rectifiers, DC cubicles withAFB® arc-free ultra high-speed circuit breakers, substation control system based on SOTA® PLC with IEC 61850 communication protocol support.
  • Communication with the upper level: Przygraniczna substation was integrated into MPK-Łódź Central Operations Control Centre via 5G network.

Application of vacuum medium-voltage circuit breakers and innovative AFB DC circuit breakers based on vacuum switching technology ensured compliance of the substation with the European Union gas emission neutrality directives. The implemented solutions have increased the level of reliability, safety, environmental safety and economic efficiency of the substation operation.