Special-purpose traction substation for test site of Kryukovsky railway car building works

Works performed

Turn-key project. Supply of electrical equipment package for AC contact network 27,5 kV, as well as for DC contact networks 3,3 kV, 825 V, 600 V power supply. Installation, commissioning.

Supply package included PLUTON modern equipment:

  • NEX switchgear 6 kV — 1 set;
  • switching device — 2 units;
  • converter dry-type transformers 2500 kVA — 2 units;
  • multisection thyristor rectifier — 1 unit;
  • DC switchgear 3.3 kV — 1 unit;
  • DC switchgear 27.5 kV — 1 set;
  • auxiliaries and operative current cabinet — 1 unit;
  • telecontrol equipment and SCADA software — 1 set.