PLUTON took part in the InnoTrans 2024 in Berlin More details
Ukraine |en

Sites

TS-94

Works performed

Supply of equipment, supervision installation and adjustment for reconstruction of traction substation of departmental railway at PJSC "South Mining and Processing Plant"

Sites

TS-94

Works performed

Supply and installation of cubicles with traction substation return lines disconnectors:

  • module with negative busbar switchgear 1,65 kV — 1 pc.;
  • negative busbar switchgear 1,65 kV — 5 pcs.

Within the framework of the reconstruction project 9 switchgears series RU-1,65 and 4 rectifiers series V-TPED were supplied for improvement of traction substation power supply.